In line with Grid Code JSC EMS Belgrade draws up the Annual Plan of transmission system operations based on annual plan of balance groups. Balance responsible parties have to deliver annual plan of their balance groups which shall comprise at the monthly level data stipulated in the Article 6.4.2.6 of the Grid Code not later than October 1st in following year for the next year.

Regarding Article 6.4.2.6. EMS JSC Belgrade has defined forms in which data has to be delivered depending if balance group includes balance entities or not. The form for balance group without balance entities is available on link1. The general form for balance group which includes entities is available on link2, additionally JSC EMS Belgrade is sending the form specially adopted for that balance group by email.

The cells with text in red should be filled with data for balance responsible party and balance group.

Fulfilled forms shall be delivered to JSC EMS Belgrade by email on address gpr@ems.rs

In accordance with Grid Code of transmission system and European regulations (SOGL), JSC EMS prepares a report on determination of the required primary, secondary and tertiary reserves for the following year.

The current report can be found at link 3.