EMS publishes planned and unplanned outages of interconnection tie-lines, as follows:
– Name of interconnection tie-line;
– Border;
– Voltage level;
– Outage period;
– in case of unplanned outage, reason of outage.

Unplaned 

EMS publishes unplanned outages of elements of the Power System, which have impact on cross border transfer capacities.

The capacity right allocated to the Capacity Right Holders on a border/direction in the Auction, may be a restricted wholly or partially, in certain time period due to Force Majeure or other unscheduled events in the electric power system.

Unplanned tie-line outages for 2023

Unplanned tie-line outages for 2024

Planed

In coordination with tranmsission system users and neigbouring transmission system operators, EMS JSC Belgrade prepares plans of outages of elements of the Power System. EMS JSC Belgrade publishes planned outages of elements of the Power System, which have impact on values of the cross border transfer capacities.

The holders of the right to use the transfer capacity which is allocated at any border/direction in the Auction may be restricted to the use of a part of that capacity or the whole the capacity within a certain period of time due to the scheduled annual disconnections of the cross-border interconnection lines for regular maintenance.

Provisional (indicative) tie-lines maintenance schedule for 2014

Provisional (indicative) tie-lines maintenance schedule for 2015

Provisional (indicative) tie-lines maintenance schedule for 2016

Provisional (indicative) tie-lines maintenance schedule for 2017

Provisional (indicative) tie-lines maintenance schedule for 2018

Provisional (indicative) tie-lines maintenance schedule for 2019

Provisional (indicative) tie-lines maintenance schedule for 2020

Provisional (indicative) tie-lines maintenance schedule for 2021

Provisional (indicative) tie-lines maintenance schedule for 2022

Provisional (indicative) tie-lines maintenance schedule for 2023

Provisional (indicative) tie-lines maintenance schedule for 2024

Provisional (indicative) tie-lines maintenance schedule for 2025